Title: Recommendation to adopt Plans and Specifications No. R-6791 for the improvements of Cherry Avenue between Ocean Boulevard and Pacific Coast Highway; award the contract to Alabbasi Construction and Engineering, of Riverside, CA, for the base bid in the amount of $1,849,999, and authorize a 15 percent contingency in the amount of $277,500, for a total contract amount not to exceed $2,127,499; and authorize City Manager or designee, to execute all documents necessary to enter into the contract, including any necessary amendments thereto; and Increase appropriations in the Transportation Fund (SR 182) in the Public Works Department (PW) by $950,000. (Districts 2,4)
Sponsors: Public Works, Financial Management
Indexes: Contracts
Attachments: 1. 072214-R-24sr&att.pdf
Related files: 33496_000
TITLE
Recommendation to adopt Plans and Specifications No. R-6791 for the improvements of Cherry Avenue between Ocean Boulevard and Pacific Coast Highway; award the contract to Alabbasi Construction and Engineering, of Riverside, CA, for the base bid in the amount of $1,849,999, and authorize a 15 percent contingency in the amount of $277,500, for a total contract amount not to exceed $2,127,499; and authorize City Manager or designee, to execute all documents necessary to enter into the contract, including any necessary amendments thereto; and

Increase appropriations in the Transportation Fund (SR 182) in the Public Works Department (PW) by $950,000. (Districts 2,4)

DISCUSSION
City Council approval is requested to enter into a contract with Alabbasi Construction and Engineering for improvements to Cherry Avenue. The street infrastructure on Cherry Avenue between Ocean Boulevard and Pacific Coast Highway is in need of rehabilitation. The rehabilitation work consists of replacing damaged curbs and gutters, driveways, alley entrances, sidewalk and the trimming or shaving of tree roots; reconstructing areas of deteriorated pavement; cold milling and resurfacing the pavement; installing bus pads, traffic striping, markings, and markers; traffic control; water quality best management practices; and related improvements between Ocean Boulevard and Pacific Coast Highway. This project was closely coordinated with the City of Signal Hill Cherry Avenue widening project. A vicinity map showing the project location is attached.

This project was advertised in the Press-Telegram on May 9, 2014, and 2,834 potential bidders specializing in construction were notified of the bid opportunity. Of those bidders, 72 sets of bid documents were purchased or downloaded via the electronic bid system. The bid document was made available from the Purchasing Division, located on the seventh floor of City Hall, and the Division's. website at Y:£:!j~!Q!J~~~g.m(}J]J::!.[£~~;!., and was a...