File #: 21-191WA    Version: 1 Name: Adopt Specifications WD-15-19 for the North Long Beach Collection Main Control Valve Upgrade Project (EO-3435)
Type: WA-Agenda Item Status: Approved
File created: 10/7/2021 In control: Water Commission (now under Utilities Commission)
On agenda: 10/14/2021 Final action: 10/14/2021
Title: Recommendation to adopt Specifications WD-15-19 for the North Long Beach Collection Main Control Valve Upgrade Project (EO-3435) and authorize the General Manager to sign a construction contract with Cora Constructors, Inc., in the amount of $1,249,350. Bureau: Engineering
Attachments: 1. 2021 10-14 #07 Cora Constructors, Inc. (EO-3435), 2. 2021 10-14 #07 Cora Constructors, Inc. (EO-3435) - Attachment, 3. 2021 10-14 #07 Cora Constructors EO-3435 - Presentation

TITLE

Recommendation to adopt Specifications WD-15-19 for the North Long Beach Collection Main Control Valve Upgrade Project (EO-3435) and authorize the General Manager to sign a construction contract with Cora Constructors, Inc., in the amount of $1,249,350.

 

Bureau:  Engineering

 

FISCAL IMPACT

The cost to the Water Fund will be incurred during FY 22 with the annual amount being the contract total of $1,249,350.  The costs are included in the Water Fund FY 22 CIP budget.

 

SUGGESTED ACTION

Approve recommendation.