File #: 08-0876    Version: 1 Name: PW - Imp of Easy Ave. - 20th to 27th Sts
Type: Contract Status: CCIS
File created: 8/14/2008 In control: City Council
On agenda: 9/2/2008 Final action: 9/2/2008
Title: Recommendation to adopt Plans and Specifications No. R-6675 for the improvement of Easy Avenue between 20th Street and 27th Street; and authorize City Manager to award the contract to Imperial Paving Inc., in an estimated amount of $1,161,550 plus a 15 percent contingency amount, if necessary. (District 7)
Sponsors: Public Works
Indexes: Contracts
Attachments: 1. 090208-R-30sr&att.pdf
Related files: 30848_000
TITLE
Recommendation to adopt Plans and Specifications No. R-6675 for the improvement of Easy Avenue between 20th Street and 27th Street; and authorize City Manager to award the contract to Imperial Paving Inc., in an estimated amount of $1,161,550 plus a 15 percent contingency amount, if necessary. (District 7)

DISCUSSION
The pavement on Easy Avenue between 20th Street and 2th Street is in need of rehabilitation. The rehabilitation work consists of replacing damaged curbs, gutters, and sidewalk, removing and replacing bituminous surfaces, cold milling, resurfacing the pavement, improvement of bus stop street pads, and installing new pavement markings, traffic striping, curb painting, and loop detectors. A vicinity map of the area is attached as Exhibit A.

City Council's adoption of the plans and specifications and award of the contract to the lowest responsible 'bidder are being recommended concurrently in order to expedite implementation of this project. The project was advertised for bid on June 30, 2008, and bids were opened on July 30, 2008. Information regarding Imperial Paving Inc., is provided on the attached contract awards document as Exhibit B. In accordance with the California Environmental Quality Act, Categorical Exemption No. CEP-212-04 has been issued for this project.

This matter was reviewed by Deputy City Attorney Linda Trang on August 12, 2008 and by Budget Management Officer Victoria Bell on August 18, 2008.

SUSTAINABILlTY

The project will include the installation of debris deflectors, and trash/bacteria filter inserts into catch basins located along this stretch of roadway to treat and improve the quality of the storm water runoff from these streets.

In addition, all ofthe old asphalt material to be removed under this contract (2,000 tons) will be recycled into new asphalt or utilized as base material on other street projects. This equates to 1,400 times the tons of trash disposed by a typical Long Beach family over a one-year peri...