Skip to main content
Long Beach, CA
File #: 21-018WA    Version: 1 Name: Execute an agreement with KYLE Groundwater, Inc., to provide Hydrogeological/Engineering Design and Construction Management Services
Type: WA-Agenda Item Status: Approved
File created: 1/28/2021 In control: Water Commission (now under Utilities Commission)
On agenda: 2/4/2021 Final action: 2/4/2021
Title: Recommendation to authorize the General Manager to execute an agreement with KYLE Groundwater, Inc., to provide Hydrogeological/Engineering Design and Construction Management Services to Drill, Develop, Construct and Equip Two (2) New Municipal Water Wells, Alamitos 9A and Alamitos 14 and to Destroy Three (3) Existing Municipal Water Wells, Alamitos 9, Annex 201, and Commission 13 (O-0749), in an amount not-to-exceed $1,809,936. BUREAU: Engineering
Attachments: 1. Agenda item 6. Kyle Grounwater, 2. 02042021 KYLE Groundwater - Presentation (O-0749) FINAL

TITLE

Recommendation to authorize the General Manager to execute an agreement with KYLE Groundwater, Inc., to provide Hydrogeological/Engineering Design and Construction Management Services to Drill, Develop, Construct and Equip Two (2) New Municipal Water Wells, Alamitos 9A and Alamitos 14 and to Destroy Three (3) Existing Municipal Water Wells, Alamitos 9, Annex 201, and Commission 13 (O-0749), in an amount not-to-exceed $1,809,936.

 

BUREAU:  Engineering

 

FISCAL IMPACT

The cost to the Water Fund will be included and incurred during FY 21 thru FY 24 with the actual annual amounts unknown at this time, but the total amount will not exceed the contract total of $1,809,936.

 

SUGGESTED ACTION

Approve recommendation.