File #: 16-1116    Version: 1 Name: LBA - Federal Inspection Service Facility Feasibility Study D5
Type: Contract Status: Withdrawn
File created: 11/22/2016 In control: City Council
On agenda: 12/13/2016 Final action: 12/13/2016
Title: WITHDRAWN Recommendation to receive and file the presentation and report of the Federal Inspection Service Facility Feasibility Study conducted by Jacobs Engineering Group; Authorize City Manager, or designee, to negotiate with interested Long Beach carriers or operators a financial agreement for the development of a Customs and Border Protection facility at the Long Beach Airport, subject to further City Council action for execution of the final terms and conditions of the agreement; and Authorize City Manager, or designee, to execute and submit all documents necessary to the United States Department of Homeland Security for designation of the Long Beach Airport as a United States Customs and Border Protection User Fee Airport for the processing of aircraft, passengers and cargo arriving from outside the United States. (Citywide)
Sponsors: Long Beach Airport
Attachments: 1. 121316-R-23sr&att.pdf

TITLE

WITHDRAWN

Recommendation to receive and file the presentation and report of the Federal Inspection Service Facility Feasibility Study conducted by Jacobs Engineering Group;

 

Authorize City Manager, or designee, to negotiate with interested Long Beach carriers or operators a financial agreement for the development of a Customs and Border Protection facility at the Long Beach Airport, subject to further City Council action for execution of the final terms and conditions of the agreement; and

 

Authorize City Manager, or designee, to execute and submit all documents necessary to the United States Department of Homeland Security for designation of the Long Beach Airport as a United States Customs and Border Protection User Fee Airport for the processing of aircraft, passengers and cargo arriving from outside the United States.  (Citywide)

 

DISCUSSION

Long Beach Airport

 

The Long Beach Airport (Airport) operates as a department of the City of Long Beach (City) and is a self-sustaining enterprise, generating its own revenues to support its expenses.  It currently serves the local region’s needs with four passenger air carriers, two integrator/cargo air carriers, along with a variety of general aviation users, ranging from individual aircraft owner/operators to corporately-owned businesses that support the broader general aviation market.  In 2015, the Airport served over 2.5 million passengers and nearly 25 thousand tons of air cargo.

 

Noise Ordinance 

 

The Noise Ordinance allows for a minimum of 41 daily air carrier flight slots and 25 daily commuter flight slots. The Noise Ordinance also allows for additional air carrier and commuter flight slots (supplemental flight slots) if the cumulative noise generated for the respective noise budgets for air carrier and commuter flights for the prior 12-month period will permit for additional flights, so as not to exceed the noise budget.  In spring 2016, the Airport allocated 9 air carrier supplemental flight slots, resulting in a total of 50 air carrier flight slots.

 

Air carrier allocation of the established minimum 41 flight slots and the 9 supplemental flight slots (total of 50 slots) could not increase with the introduction of international service at the Airport, because the Noise Ordinance does not consider flight origination or destination but rather cumulative noise levels as monitored and measured by the Airport’s robust and long-standing noise management program.  

 

Federal Inspection Service (FIS) Facility Feasibility Study

 

On February 23, 2015, JetBlue Airways (JetBlue) provided a written request to the Airport Director requesting that the Airport and City apply to the United States Department of Homeland Security for consideration to designate the Long Beach Airport as a United States Customs and Border Protection (CBP) User Fee Airport (UFA) to establish a Federal Inspection Service (FIS) facility at the Airport for the processing of aircraft, passengers and cargo arriving from outside of the United States.  This would allow interested Long Beach carriers or operators to utilize a portion of their current allotment of air carrier and supplemental flight slots for international commercial passenger service. A UFA designation allows for the processing of international arriving passengers at an airport, and the staffing costs associated with this are borne by the airport and typically passed through to participating users (airlines and/or private aircraft).  CBP officers are onsite only as scheduled for international arrivals clearance services.  Clearance services are not available at other times.

 

A Request for Qualifications (RFQ) was released on August 25, 2015, and on January 19, 2016, the City Council awarded a contract to Jacobs Engineering Group to prepare a report to determine the feasibility, financial or otherwise, of a FIS facility at the Airport.  The final contract was fully executed in late February 2016, and two community meetings were held on March 30 and April 20, 2016. 

 

The FIS Study (Study) was released for public review on October 4, 2016.  A separate analysis conducted by the City Attorney examining possible effects to the Noise Ordinance was also released concurrently with the Study.  The City Attorney concluded that the City’s consideration of FIS facility improvements would not jeopardize the grandfathered Airport Noise and Capacity Act (ANCA) status of the Noise Ordinance.  A presentation of the Study and opportunity for public comment were provided at the Airport Advisory Commission meeting on October, 20, 2016, and at the Economic Development Commission meeting on October 25, 2016.  A summary of the Commission meetings is attached.

 

The Study analyzed seven components to assess the feasibility of a FIS facility at the Airport. These components include market analysis, environmental compliance requirements, economic impact, facility siting alternatives, airport scope and capability, financial feasibility, and security risk assessment. Based on a thorough analysis of these components, the Study concluded that a FIS facility would be feasible.

 

City Staff Recommendation

 

As a recipient of federal funding from the Federal Aviation Administration (FAA), the Airport is obligated to maintain and operate its facilities safely and efficiently and in accordance with specified conditions.  These conditions include the Airport maintaining a fee and rental structure for the facilities and services at the airport that will make it as self-sustaining as possible; not causing or permitting any activity or action that would interfere with its use for airport purposes; and, ensuring it is available as an airport for public use on reasonable terms and without unjust discrimination for all types, kinds and classes of aeronautical activities.  Finally, the Airport is tasked with managing all aspects of the Noise Ordinance to insure compliance for the benefit of both the users and the surrounding community. 

 

Based on the findings of the Study, the conclusions of the City Attorney’s Opinion, and the Airport’s obligations to the City and the FAA in managing its activities and operations, City staff recommends moving forward on the process for development of a FIS facility.  The following concurrent steps, seeking CBP approval for UFA designation and negotiating with interested Long Beach carriers or operators a financial agreement for the FIS facility, are critical.  The steps required to apply for designation as a UFA include:

 

                     At the request of the City, the submission of a letter addressed to the CBP Commissioner from the Governor, supporting the UFA designation for the Airport;

 

                     An initial site visit, coordinated through the local CBP Area Port Director, to discuss facility requirements, workload and services;

 

                     Through a competitive process, a general contractor would be engaged to design and obtain permit approval for the facility, based on CBP concept approval;

 

                     Periodic visits by CBP officials to verify that the facility construction is consistent with approved plans and requirements;

 

                     Parallel to construction, completion by the City of a Memorandum of Agreement and Agricultural Compliance Agreement with CBP, which state responsibilities, fees, hours of service, and proper handling of international refuse;

 

                     At 85 percent completion, CBP officials verify that facilities are 85 percent complete and adequate for inspectional services to be provided;

 

                     CBP would begin the recruitment and training of dedicated CBP staff of the Airport facility and acquire the approved information technology and other required administrative improvements; and,

 

                     Final site visit in which CBP officials verify that facilities are 100 percent complete and adequate for inspectional services to be provided before taking possession of those new dedicated facilities.

 

Once the Airport receives CBP designation and a financial agreement is executed with interested Long Beach carriers or operators, RFQs will be released for environmental review, as identified in the Environmental Compliance Assessment, and selection of a contractor for a design-build project for construction of the proposed FIS facility.  Authorization to award a design-build contract will be subject to future City Council approval.

 

The recommended action does not constitute approval of the project itself, but is a preliminary step to further define and refine the parameters of the project and determine if appropriate financing can be negotiated. Engaging with CBP is also a crucial step, because this will determine the ultimate facility layout and overall square footage.  If these incremental steps indicate the appropriateness of moving forward, a final project description and cost associated to develop and operate a FIS facility, will be presented to the City Council for its consideration, together with appropriate environmental review and documentation.

 

This matter was reviewed by Assistant City Attorney Michael J. Mais and by Budget Management Officer Rhutu Amin Gharib on November 29, 2016.

 

TIMING CONSIDERATIONS

City Council action is requested on December 13, 2016, to commence the estimated two-year process for the development of a FIS facility at the Airport.

 

FISCAL IMPACT

The cost to develop and operate the Customs and Border Protection Facility is to be negotiated with interested Long Beach carriers or operators and will be brought forth to the City Council at a later date.

 

SUGGESTED ACTION

Approve recommendation.

 

Respectfully Submitted,

JESS L. ROMO, A.A.E.

DIRECTOR, LONG BEACH AIRPORT

 

 

 

APPROVED:

 

PATRICK H. WEST

CITY MANAGER