<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Long Beach - File #: 18-0945</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3703508&amp;GUID=8BE7A18E-A13B-4DA2-A1E9-4D7AC7F46BB8</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://longbeach.legistar.com/Feed.ashx?M=LD&amp;ID=3703508&amp;GUID=8BE7A18E-A13B-4DA2-A1E9-4D7AC7F46BB8" rel="self" type="application/atom+xml" /><item><title>City of Long Beach - File #: 18-0945</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3703508&amp;GUID=8BE7A18E-A13B-4DA2-A1E9-4D7AC7F46BB8</link><guid isPermaLink="false">8BE7A18E-A13B-4DA2-A1E9-4D7AC7F46BB8-2023-04-28-17-54-39</guid><description>Title: Recommendation to authorize City Manager, or designee, to execute all documents necessary to amend the existing Cooperative Agreement between the City of Long Beach and the City of Signal Hill, for the construction of the Los Cerritos Channel Sub-Basin 4 Stormwater Capture Facility Project; to increase the reimbursement amount from $350,000 to $565,000 for additional City of Long Beach administrative and construction costs; and

Authorize City Manager, or designee, to execute all documents necessary to enter into a Memorandum of Understanding between the City of Long Beach, the City of Signal Hill, and the Los Angeles County Flood Control District, for the construction of Phase 3 of the Los Cerritos Channel Sub-Basin 4 Stormwater Capture Facility Project.  (District 5)</description><pubDate>Fri, 28 Apr 2023 17:54:39 GMT</pubDate></item></channel></rss>