Long Beach, CA
File #: 11-0763    Version: 1 Name: PRM - Contract w/Bellingham for Phase 1B
Type: Contract Status: CCIS
File created: 5/31/2011 In control: City Council
On agenda: 8/23/2011 Final action: 8/16/2011
Title: Recommendation to authorize City Manager to amend Contract No. 31687 with Bellingham Marine Industries, Inc., for an additional $6,430,000 for expenditures associated with Phase 1B of the Alamitos Bay Marina rebuild project; and execute all documents necessary to complete the final design, engineering, and construction of Basin 4 in the Alamitos Bay Marina, for a revised contract amount not to exceed $18,230,000. (District 3)
Sponsors: Parks, Recreation and Marine
Indexes: Amendments, Contracts
Attachments: 1. 080911-R-17sr&att.pdf, 2. 081611-UB-23 sr&att.pdf
Related files: 15-0232, 12-0744, 13-1052, 31687_002, 12-0147, 13-0525, 15-0969
TITLE
Recommendation to authorize City Manager to amend Contract No. 31687 with Bellingham Marine Industries, Inc., for an additional $6,430,000 for expenditures associated with Phase 1B of the Alamitos Bay Marina rebuild project; and execute all documents necessary to complete the final design, engineering, and construction of Basin 4 in the Alamitos Bay Marina, for a revised contract amount not to exceed $18,230,000. (District 3)

DISCUSSION
On February 16, 2010, the City Council authorized the City Manager to enter into a design-build contract with Bellingham Marine Industries, Inc. (Bellingham), for the design, engineering, and construction of Basin 4 in the Alamitos Bay Marina, in an amount not to exceed $11,800,000 (Attachment). The City of Long Beach and Bellingham subsequently entered into Contract No. 31687 on June 28, 2010.

Due to the magnitude of the Alamitos Bay Marina rebuild project, the Department of Parks, Recreation and Marine (PRM) and Bellingham agreed to segregate each basin rebuild into phases. The first phase was then segregated into two phases, Phase 1A and Phase 1B. Phase 1A includes all in-water work for Basin 4 and the longdock surrounding the Long Beach Yacht Club. Phase 1B includes all land-based construction of Basin 4, and the construction of an eelgrass mitigation area in Marine Stadium, as required by a policy set forth by the National Oceanic and Atmospheric Administration. Contract No. 31687, as approved by the City Council on February 16, 2010, included Phase 1A only.

At this time, PRM is requesting authorization to amend Contract No. 31687 to include the design, engineering, and construction required under Phase 1B. The estimated cost for Phase 1B is $6,430,000.

The total Bellingham costs for Phases 1A and 1B are estimated at $18,230,000, and will be funded utilizing a combination of DBW loan funds totaling $18,220,000, and $6,200,000 budgeted in the Marina Fund. The $24,420,000 currently available for the rebuild p...

Click here for full text