Long Beach, CA
File #: 22-190WA    Version: 1 Name: Recommendation to authorize the General Manager to execute an agreement with DRP Engineering, Inc., to provide engineering design services for the Water Main Improvement Project 2-C at Long Beach Airport Tarmac (MC-5232) in the amount not to exceed $300,6
Type: WA-Agenda Item Status: Approved
File created: 9/21/2022 In control: Water Commission (now under Utilities Commission)
On agenda: 9/29/2022 Final action: 9/29/2022
Title: Recommendation to authorize the General Manager to execute an agreement with DRP Engineering, Inc., to provide engineering design services for the Water Main Improvement Project 2-C at Long Beach Airport Tarmac (MC-5232) in the amount not to exceed $300,681.
Attachments: 1. 2022 09-29 06 DRP - MC-5232, 2. 2022 09-29 06 DRP - MC-5232 - Presentation

TITLE

Recommendation to authorize the General Manager to execute an agreement with DRP Engineering, Inc., to provide engineering design services for the Water Main Improvement Project 2-C at Long Beach Airport Tarmac (MC-5232) in the amount not to exceed $300,681.

 

SUGGESTED ACTION

Approve recommendation.