Long Beach, CA
File #: 22-0963    Version: 1 Name: PW - Contract w/Spectra Company to install new window at Bayshore Library D3 (PW)
Type: Contract Status: CCIS
File created: 8/1/2022 In control: City Council
On agenda: 8/16/2022 Final action: 8/16/2022
Title: Recommendation to authorize City Manager, or designee, to execute a contract, and any necessary documents including any necessary subsequent amendments, with Spectra Company, of Pomona, CA, to furnish and install new windows as part of a deferred maintenance program at the Bay Shore Library, in the amount of $373,512, with a 20 percent contingency in the amount of $74,702, for a total contract amount not to exceed $448,214, for a period of one-year, with the option to renew for four additional one-year periods, at the discretion of the City Manager. (District 3)
Sponsors: Public Works
Attachments: 1. 081622-C-12sr&att
Related files: 36418_000
TITLE
Recommendation to authorize City Manager, or designee, to execute a contract, and any necessary documents including any necessary subsequent amendments, with Spectra Company, of Pomona, CA, to furnish and install new windows as part of a deferred maintenance program at the Bay Shore Library, in the amount of $373,512, with a 20 percent contingency in the amount of $74,702, for a total contract amount not to exceed $448,214, for a period of one-year, with the option to renew for four additional one-year periods, at the discretion of the City Manager. (District 3)

DISCUSSION
City Council approval is requested to enter into a contract with Spectra Company, of Pomona, CA, to furnish and install new windows, and perform any related repairs, as part of a deferred maintenance program at the Bay Shore Library (Project).

Originally built in 1959, Bay Shore Library is located at 195 Bayshore Avenue (Attachment A), adjacent to Alamitos Bay. The facility serves the community of Belmont Shore and the broader Long Beach community. The current 6,900 square-foot building features large segments of window walls which require replacement to improve the building’s integrity and energy efficiency, and restore community pride in the aging facility.

The Project to furnish and install new windows is a time-sensitive undertaking, as the existing windows are beyond repair and their conditions have led to ongoing water intrusion during rain events, which have resulted in damage and deterioration to the facility. The installation of new aluminum clad series windows will address the water intrusion problems, while increasing energy efficiency for the facility. Additional repairs will be made to areas of the building that have experienced water damage. The fabrication of the new windows has a long lead time due to the custom sizing and dimensions required for the existing building. The fabrication process is anticipated to take six (6) to eight (8) months.

Under a separate job o...