Long Beach, CA
File #: 21-089TR    Version: 1 Name: Santa Fe Avenue Corridor Improvement Project
Type: TR-Agenda Item Status: Approved
File created: 12/3/2021 In control: Long Beach Transit
On agenda: 12/9/2021 Final action: 12/9/2021
Title: Recommendation to authorize the President and CEO to enter into a contract with ETA Transit Systems, Inc., for the manufacturing, delivery and installation of 30 solar-powered LED electronic signage (eSigns) passenger information system for bus stops along Santa Fe Avenue at a cost of $252,534, with a 7% contingency of $17,677, for a total authorization amount not to exceed $270,211. (Olanrewaju Adelekan)
Attachments: 1. 12. Santa Fe Avenue Corridor Improvement Project Board Report

TITLE

Recommendation to authorize the President and CEO to enter into a contract with ETA Transit Systems, Inc., for the manufacturing, delivery and installation of 30 solar-powered LED electronic signage (eSigns) passenger information system for bus stops along Santa Fe Avenue at a cost of $252,534, with a 7% contingency of $17,677, for a total authorization amount not to exceed $270,211. (Olanrewaju Adelekan)

 

SUGGESTED ACTION

Approve recommendation.