Title:
|
Recommendation to authorize the President and CEO to enter into a contract with Global Diversified Voltage for the construction of the Automatic Transfer Switch Replacement Project at LBT1 and LBT2 at a cost of $208,638, with a 10% contingency, for a total authorization amount not to exceed $229,502. (Jim Scott)
|