File #: 21-017TR    Version: 1 Name: Automatic Transfer Switch Replacement
Type: TR-Agenda Item Status: Approved
File created: 2/19/2021 In control: Long Beach Transit
On agenda: 2/25/2021 Final action: 2/25/2021
Title: Recommendation to authorize the President and CEO to enter into a contract with Global Diversified Voltage for the construction of the Automatic Transfer Switch Replacement Project at LBT1 and LBT2 at a cost of $208,638, with a 10% contingency, for a total authorization amount not to exceed $229,502. (Jim Scott)
Attachments: 1. 11. Automatic Transfer Switch Replacement

TITLE

Recommendation to authorize the President and CEO to enter into a contract with Global Diversified Voltage for the construction of the Automatic Transfer Switch Replacement Project at LBT1 and LBT2 at a cost of $208,638, with a 10% contingency, for a total authorization amount not to exceed $229,502. (Jim Scott)

 

SUGGESTED ACTION

Approve recommendation.