Title:
|
Recommendation to authorize the President and CEO to enter into a contract with Dorado Design and Construction, Inc., for the construction of the LBT1 Battery-Electric Bus Charging Station Expansion at a cost of $236,285, with a 10% contingency, for a total authorization amount not to exceed $259,914. (Jim Scott)
|