Title:
|
Recommendation to authorize the President and CEO to enter into a contract with Fast-Track Construction Corporation (Fast-Track), for the design-build construction of the Battery Electric Bus station at the Long Beach Convention Center (Convention Center), for a total authorization amount not to exceed $1,465,314. (Rolando Cruz)
|