Long Beach, CA
File #: 16-064TR    Version: 1 Name: BEB Station Design-Build Construction at the Long Beach Convention Center
Type: TR-Agenda Item Status: Approved
File created: 7/8/2016 In control: Long Beach Transit
On agenda: 7/25/2016 Final action: 7/25/2016
Title: Recommendation to authorize the President and CEO to enter into a contract with Fast-Track Construction Corporation (Fast-Track), for the design-build construction of the Battery Electric Bus station at the Long Beach Convention Center (Convention Center), for a total authorization amount not to exceed $1,465,314. (Rolando Cruz)
Attachments: 1. 11. BEB Station Design-Build Construction at the Long Beach Convention Center

TITLE

Recommendation to authorize the President and CEO to enter into a contract with Fast-Track Construction Corporation (Fast-Track), for the design-build construction of the Battery Electric Bus station at the Long Beach Convention Center (Convention Center), for a total authorization amount not to exceed $1,465,314. (Rolando Cruz)

 

SUGGESTED ACTION

Approve recommendation.