File #: 13-0565    Version: 1 Name: PW/PRM/FM-Ocean Blvd Erosion & Enhancement Project
Type: Contract Status: CCIS
File created: 6/20/2013 In control: City Council
On agenda: 7/9/2013 Final action: 7/9/2013
Title: Recommendation to adopt Plans and Specifications No. R-6959 for the Ocean Boulevard Erosion and Enhancement Project, Phase 2, award the Base Bid plus Additive Items AA, CC, DD, and HH, and to authorize City Manager to execute the contract with Drill Tech Drilling & Shoring, Inc., in the amount of $4,442,768, plus a 15 percent contingency in the amount of $666,415, if necessary and subject to funding availability, for a total not to exceed amount of $5,109,183, and any amendments thereto. (District 3)
Sponsors: Public Works, Financial Management, Parks, Recreation and Marine
Indexes: Contracts
Attachments: 1. 070913-R-34sr&att.pdf
Related files: 14-1054, 15-0255
TITLE
Recommendation to adopt Plans and Specifications No. R-6959 for the Ocean Boulevard Erosion and Enhancement Project, Phase 2, award the Base Bid plus Additive Items AA, CC, DD, and HH, and to authorize City Manager to execute the contract with Drill Tech Drilling & Shoring, Inc., in the amount of $4,442,768, plus a 15 percent contingency in the amount of $666,415, if necessary and subject to funding availability, for a total not to exceed amount of $5,109,183, and any amendments thereto. (District 3)

DISCUSSION
A Bluff Erosion and Enhancement Master Plan (Master Plan) was developed for the bluff areas from 1st Place through 36th Place through a community input process and completed in 2000. The Master Plan identified a 4,000 linear-foot bluff area adjacent to Ocean Boulevard (from 20th to 36th Place) that requires significant erosion control improvements. Due to funding constraints, the project was divided into two phases. Construction of the Phase 1 Project was completed in 2012, which stabilized the area between Redondo Avenue and 36th Place using soil-nailing technology. The Base Bid plus Additive Items AA, CC, DD, and HH of the current Project (Phase 2) have been selected. This Phase consists primarily of stabilizing the bluffs spanning from 20th Place to Redondo Avenue with similar soil-nailing technology, but also includes additional landscaping, including planter pockets. A new irrigation system, sidewalk repairs, and new hand rails, similar to the existing ones, will also be installed.

The City Council’s adoption of the plans and specifications and award of the contract to the lowest responsible bidder are being recommended concurrently in order to expedite the project. The project was advertised for bids on April 30, 2013, and bids were opened on May 22, 2013. In addition to placing an advertisement for bids in the Long Beach Press Telegram, bid documents were made available through the City’s weblink at gov in a ...