File #: 15-1084    Version: 1 Name: LBA - Agrmnt w/HNTB for planning/engineering svcs for Airport Geometry Study Phase 2 D5
Type: Contract Status: CCIS
File created: 10/1/2015 In control: City Council
On agenda: 10/20/2015 Final action: 10/20/2015
Title: Recommendation to adopt Specifications No. RFQ AP15-093 and award a contract to the HNTB Corporation, of Los Angeles, CA, for planning and engineering consulting services for the Airfield Geometry Study Phase 2 at the Long Beach Airport, in an amount not to exceed $873,497, for an initial 12-month term; authorize City Manager, or designee, to execute all documents necessary to enter into the contract, including any amendments to extend the term for up to one additional year, authorize additional services within the provisions of the contract; and Increase appropriations in the Airport Fund (EF 320) in the Airport Department (AP) by $834,072. (District 5)
Sponsors: Long Beach Airport
Indexes: Contracts
Attachments: 1. 102015-R-21sr.pdf
Related files: 14-0948, 14-1031, 11-1217, 11-0117, 34105_000, 34105_001
TITLE
Recommendation to adopt Specifications No. RFQ AP15-093 and award a contract to the HNTB Corporation, of Los Angeles, CA, for planning and engineering consulting services for the Airfield Geometry Study Phase 2 at the Long Beach Airport, in an amount not to exceed $873,497, for an initial 12-month term; authorize City Manager, or designee, to execute all documents necessary to enter into the contract, including any amendments to extend the term for up to one additional year, authorize additional services within the provisions of the contract; and

Increase appropriations in the Airport Fund (EF 320) in the Airport Department (AP) by $834,072. (District 5)

DISCUSSION
City Council approval is requested to enter into a contract with the HNTB Corporation, for planning and engineering consulting services for the Airfield Geometry Study Phase 2 at the Long Beach Airport.

On December 9, 2014, the City Council authorized the City Manager to apply for Federal Aviation Administration (FAA) grant funds to continue with the Airfield Geometry Study Phase 2 (Study), which will develop a new Airport Layout Plan (ALP) and associated official maps and documents required to maintain the Long Beach Airport (Airport). The FAA provided the grant funding at the end of Fiscal Year 2015.

The City of Long Beach has historically used outside professional firms to provide special studies and reports when the City does not have sufficient specialized expertise to perform such work with existing staff.

The Request for Qualifications (RFQ) was advertised in the Long Beach Press-Telegram on June 19, 2015, and 3,734 potential bidders specializing in engineering consulting services were notified of the RFQ opportunity. Of those potential bidders, 55 downloaded the RFQ via the City’s electronic bid system. The RFQ documents were made available from the Purchasing Division, located on the seventh floor of City Hall, and the Division’s website at www.longbeach.gov/purchasing. An RFQ an...