TITLE
Recommendation to adopt resolution approving the Traffic Mitigation Program Fourteenth Annual Report (Fiscal Year 2004-2005) and making findings relative thereto, and amend the Traffic Mitigation Program to add the following projects: (Citywide)
Long Beach ITS: Integration of various intelligent transportation system projects including but not limited to adaptive traffic signal systems, Closed Circuit Television (CCTV), and changeable message signs at key locations with the City to improve mobility and reduce traffic congestion.
Anaheim/Redondo Intersection Widening: Widening of the southbound approach to the intersection to install a dedicated right-turn pocket.
Alamitos/Orange/15th/16th Traffic Flow Enhancement Project: Reconfiguration of the Orange Avenue and Alamitos intersections at 15th and 16th, and installation of a new traffic signal at Alamitos/15th to improve the intersection geometrics and enhance safety.
Walnut Avenue/Alamitos/20th Intersection Reconfiguration Project: Reconfiguration and consolidation of two closely spaced intersections into one single signalized intersection to provide enhanced bicycle and pedestrian crossings while improving traffic flow.
Pine Avenue Corridor Improvements: Modifications to the street geometric design and traffic signals for improved traffic mobility and pedestrian safety.
7th Street Corridor Improvements: Installation of traffic signal interconnect and other operational improvements for improved mobility and pedestrian safety.
Carson Street Corridor Improvements: Installation of traffic signal interconnect and operational improvements for improved mobility and pedestrian safety.
DISCUSSION
[Description/Discussion]
TIMING CONSIDERATIONS
[Timing Considerations]
FISCAL IMPACT
[Fiscal Impact]
SUGGESTED ACTION
Approve recommendation.
BODY
[Enter Resolution Header Text Here]
Respectfully Submitted,
NAME APPROVED:
TITLE
...
Click here for full text