Long Beach, CA
File #: 09-0143    Version: 1 Name: PW - Excel Paving - bikeways
Type: Contract Status: CCIS
File created: 1/26/2009 In control: City Council
On agenda: 2/10/2009 Final action: 2/10/2009
Title: Recommendation to adopt Plans and Specifications No. R-6762 for installing bike route signs on existing bikeways and installing bikeway signing and striping; Award the project to and authorize City Manager to sign all documents necessary to execute a contract with Excel Paving, dba Palp, Inc, (Excel Paving) the lowest responsible bidder, and any necessary amendments thereto relative to the scope of work, in the amount of $277,703 plus a 15% contingency amount of $41,656, if necessary, for a total of $319,359; and Increase appropriations in the Gas Tax Street Improvement Fund (SR 181) in the Department of Public Works (PW) in the amount of $256,084. (Districts 1,2,3,4,5)
Sponsors: Public Works
Indexes: Contracts
Attachments: 1. 021009-R-21sr&att.pdf
Related files: 31062_000
TITLE
Recommendation to adopt Plans and Specifications No. R-6762 for installing bike route signs on existing bikeways and installing bikeway signing and striping;

Award the project to and authorize City Manager to sign all documents necessary to execute a contract with Excel Paving, dba Palp, Inc, (Excel Paving) the lowest responsible bidder, and any necessary amendments thereto relative to the scope of work, in the amount of $277,703 plus a 15% contingency amount of $41,656, if necessary, for a total of $319,359; and

Increase appropriations in the Gas Tax Street Improvement Fund
(SR 181) in the Department of Public Works (PW) in the amount of $256,084. (Districts 1,2,3,4,5)

DISCUSSION
On December 19, 2000, the City Council authorized the City Manager to apply for and accept Federal grant funds through the 2001 Metropolitan Transportation Authority's (Metro) Call for Projects, which provided funding for projects from FY 02 - FY 07. One of the projects for which funding was requested was the design and construction of the East-West Bikeway Connections and Signage Program, which includes the installation of new bike route signs and striping on several eastbound/westbound streets. Please see Exhibit A. This will provide direct, convenient and safe routes for bicyclists, as well as east-west linkages through the City.

On July 24, 2007, the City Council awarded a contract to Excel Paving for design, development of the Plans, Specifications and Estimate, and to request authorization from Caltrans to proceed to construction. The authorization from Caltrans was received December 18, 2008.

The project was advertised for bids on December 22, 2008 and bids were opened January 14, 2009. Eight bids were received. Information regarding the bid and Excel Paving is shown on the attached contract award document as Exhibit B.

Adoption of the Plans and Specifications and award of the contract are requested concurrently to expedite the project.

This matter was review...