File #: 21-0771    Version: 1 Name: LBA - As-needed engineering design/planning services for Runway 12-30 electrical improvements project @LBG D
Type: Agenda Item Status: Approved
File created: 7/26/2021 In control: City Council
On agenda: 8/10/2021 Final action: 8/10/2021
Title: Recommendation to adopt Specifications No. RFQ AP21-054 and award contracts to Lean Technology Corporation, of Irvine, CA, for Engineering Design Services, in the amount of $465,000, with a 10 percent contingency in the amount of $46,500, for a total amount not to exceed $511,500; and, The Kennard Development Group, dba KDG Construction Consulting, of Glendale, CA, for Construction Management Services, in the amount of $465,000, with a 10 percent contingency in the amount of $46,500, for a total amount not to exceed $511,500, for Runway 12-30 Electrical Improvements at the Long Beach Airport, for a period of two years, with the option to renew for three additional one-year periods, at the discretion of the City Manager; and, authorize City Manager, or designee, to execute all documents necessary to enter into the contracts, including any necessary amendments; and Increase appropriations in the Airport Fund Group in the Airport Department by $1,023,000, offset by funds available. (Dis...
Sponsors: Long Beach Airport
Attachments: 1. 081021-R-18sr.pdf
Related files: 36074_001, 36074_000
TITLE
Recommendation to adopt Specifications No. RFQ AP21-054 and award contracts to Lean Technology Corporation, of Irvine, CA, for Engineering Design Services, in the amount of $465,000, with a 10 percent contingency in the amount of $46,500, for a total amount not to exceed $511,500; and, The Kennard Development Group, dba KDG Construction Consulting, of Glendale, CA, for Construction Management Services, in the amount of $465,000, with a 10 percent contingency in the amount of $46,500, for a total amount not to exceed $511,500, for Runway 12-30 Electrical Improvements at the Long Beach Airport, for a period of two years, with the option to renew for three additional one-year periods, at the discretion of the City Manager; and, authorize City Manager, or designee, to execute all documents necessary to enter into the contracts, including any necessary amendments; and

Increase appropriations in the Airport Fund Group in the Airport Department by $1,023,000, offset by funds available. (District 5)

DISCUSSION
City Council approval is requested to enter into contracts with Lean Technology Corporation for design services and KDG Construction Consulting for construction management services for Runway 12-30 Electrical Improvements Project (Project) at the Long Beach Airport (Airport).

Runway 12-30 is the primary Air Carrier runway and the primary runway designated for use during nighttime hours. An airfield lighting investigation performed in early 2020 indicated that the existing runway lighting and associated equipment is detrioariating and needs to be replaced. The Project will include the complete replacement of the runway lighting circuits, including associated constant current regulators (CCRs) and all cable, light fixtures, signs, precision approach path indicators (PAPIs), and other electrical components for Runway 12-30. The electrical improvements will include the full length of the runway, which is approximately 10,000 feet by 250 feet (including sho...