File #: 22-0333    Version: 1 Name: PW - Facility/Pipeline Permit to Boeing Co. D5
Type: Contract Status: CCIS
File created: 2/24/2022 In control: City Council
On agenda: 3/22/2022 Final action: 3/22/2022
Title: Recommendation to determine that the granting of Facility/Pipeline Permit Supplement No. S-16-22 under existing Facility/Pipeline Permit No. P-239-11 to The Boeing Company, will not be contrary to the public interest; and, authorize City Manager, or designee, to issue said Permit Supplement in accordance with Section 15.44.060, Permit Issuance, of the Long Beach Municipal Code for the installation of electrical conduits to power extraction wells for groundwater remediation along Harvey Way, East Village Road, and Blackthorne Avenue. (District 5)
Sponsors: Public Works
Attachments: 1. 032222-R-24sr&att
TITLE
Recommendation to determine that the granting of Facility/Pipeline Permit Supplement No. S-16-22 under existing Facility/Pipeline Permit No. P-239-11 to The Boeing Company, will not be contrary to the public interest; and, authorize City Manager, or designee, to issue said Permit Supplement in accordance with Section 15.44.060, Permit Issuance, of the Long Beach Municipal Code for the installation of electrical conduits to power extraction wells for groundwater remediation along Harvey Way, East Village Road, and Blackthorne Avenue. (District 5)

DISCUSSION
The Boeing Company has filed an application for Facility/Pipeline Permit Supplement No. S-16-22, under existing Facility/Pipeline Permit No. P-239-11, to install 2,607 feet of piping along Harvey Way, East Village Road and Blackthorne Avenue. Vicinity map for the location and description of the installation is attached (Attachment A).

This installation will allow The Boeing Company to remediate area groundwater by extracting the groundwater through wells and delivering it to an off-site treatment system through this piping where it may be treated and injected back into the subsurface through other wells or into the City of Long Beach (City) sewer system per Industrial Wastewater Discharge Permit No.017109, approved by the Long Beach Water Department (Attachment B). This new pipeline will be part of the same system initially approved by the City Council on December 5, 2006, for Facility/Pipeline Permit Supplement Nos. S-1-11, S-2-11, S-3-11 and S-4-17 under Facility/Pipeline Permit No. P-239-11.

The Department of Public Works (Public Works) has reviewed the application and found the proposed pipeline to be compatible with existing installations and not an obstacle to any street use or any known proposed developments.

Traffic control requirements, stipulated by the Public Works Traffic Engineering Division, will be included in the special conditions for the excavation permit. In addition to typical...