Long Beach, CA
File #: 12-0486    Version: 1 Name: PW - Easement deed for 350 E. Columbia St D6
Type: Deed Status: Deed
File created: 6/1/2012 In control: City Council
On agenda: 6/19/2012 Final action: 6/19/2012
Title: Recommendation to request City Manager, or designee, to accept an easement deed for street and sidewalk purposes at 350 East Columbia Street. (District 6)
Sponsors: Public Works
Indexes: Easement Deeds
Attachments: 1. 061912-C-12sr&att.pdf
TITLE
Recommendation to request City Manager, or designee, to accept an easement deed for street and sidewalk purposes at 350 East Columbia Street.  (District 6)
 
DISCUSSION
It is the goal of the Department of Public Works to widen streets and alleys to the standards established in the City's General Plan.  When significant new development is proposed, the public rights-of-way adjacent to the site are reviewed for sufficiency to accommodate the new development.  The developer remodeling the Todd Cancer Pavilion at 350 East Columbia Street is in the process of constructing a 1,809 square foot lobby addition to an existing building, a 1,026 square foot porte cochere, reconstruction of the parking lot, and construction of a right-turn lane on Long Beach Boulevard into the reconstructed parking lot.
 
A dedication for the proposed widened street and sidewalk is required. This action is described as follows:
 
The curb along Long Beach Boulevard, adjacent to the project site, south of the existing driveway is to be shifted 12 feet easterly into the developer's property to accommodate the construction of the right turn lane. This action will require a dedication for street purposes.  
 
A three-foot dedication for additional sidewalk width adjacent to the project site, along Long Beach Boulevard north of the driveway is required to conform to standards established in the City's General Plan. This action will allow for a 10-foot wide dedicated sidewalk along the total frontage of the development site. The site location and area to be dedicated is shown on the attached Exhibit A.  
 
In conformance with the California Environmental Quality Act, the City certified an Environmental Impact Report (EIR) number 2004081142 for this project.
 
This matter was reviewed by Deputy City Attorney Linda Trang on March 13, 2012, and by Budget Management Officer Victoria Bell on May 31, 2012.  
 
TIMING CONSIDERATIONS
City Council action on this matter is not time critical.
 
FISCAL IMPACT
A document processing fee totaling $2,178 ($1,089 for each of the dedications), was paid by the developer and deposited in the General Fund (GP) in the Department of Public Works (PW). No local jobs are impacted by this action.
 
SUGGESTED ACTION
Approve recommendation.
 