<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Long Beach - File #: 21-0460</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4942566&amp;GUID=E1E37627-5EC6-4384-A9FE-471A22732698</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://longbeach.legistar.com/Feed.ashx?GUID=E1E37627-5EC6-4384-A9FE-471A22732698&amp;ID=4942566&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Long Beach - File #: 21-0460</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4942566&amp;GUID=E1E37627-5EC6-4384-A9FE-471A22732698</link><guid isPermaLink="false">E1E37627-5EC6-4384-A9FE-471A22732698-2021-05-22-00-48-46</guid><description>Title: Recommendation to authorize City Manager, or designee, to execute a second Cooperative Agreement, and any necessary amendments, with the California Department of Transportation, for the design and construction phase of the Shoemaker Bridge Replacement Project (Project), located from the I-710 to its terminus on the east side of the Los Angeles River; 

Authorize City Manager, or designee, to execute all documents necessary to amend Contract No. 33938 with HDR Engineering, Inc., of Long Beach, CA, for engineering and architectural design services for the Project, to increase the contract amount by $22,550,235, for a revised contract amount not to exceed $29,526,622, and extend the term of the contract to August 30, 2024; and

Increase appropriations in the Capital Projects Fund Group in the Public Works Department by $26,900,000, offset by $12,900,000 of Measure R funds from the Los Angeles County Metropolitan Transportation Authority (MR306.19) and $14,000,000 of State Transportation Improvement Program funds from California Department of Transportation [STIPL-5108(199)].  (Distr</description><pubDate>Sat, 22 May 2021 00:48:46 GMT</pubDate></item></channel></rss>