<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Long Beach - File #: 22-057PL</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5862470&amp;GUID=B1396096-4609-4BAD-B489-DE4634B68041</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://longbeach.legistar.com/Feed.ashx?GUID=B1396096-4609-4BAD-B489-DE4634B68041&amp;ID=5862470&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Long Beach - File #: 22-057PL</title><link>https://longbeach.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5862470&amp;GUID=B1396096-4609-4BAD-B489-DE4634B68041</link><guid isPermaLink="false">B1396096-4609-4BAD-B489-DE4634B68041-2022-10-21-23-20-32</guid><description>Title: Recommendation to approve a Site Plan Review (SPR22-078) for a project consisting of the demolition of all existing structures on the site, and the construction of a new 303,972-square-foot concrete, tilt-up industrial warehouse building, including 9,000-square-feet of office space approximately 51 feet in height on a 14.16-acre lot within the General Industrial (IG) Zoning District located at 5900 Cherry Ave. (District 9)</description><pubDate>Fri, 21 Oct 2022 23:20:32 GMT</pubDate></item></channel></rss>